Paver-Grate® Suspended paver system installation sequence

pavergrate-sequence-text
 
  • Install footings
  • Excavate for tree
  • Plant tree , carefully centering it.
  • Add planting soil
  • Place Paver-Grate® components
  • Place setting bed material.
  • Cover Paver-Grate® components with landscape fabric if sanding paver joints on completion.
  • Lay Pavers per usual procedure. Edge stop built in to Paver-Grate® tree grate at tree opening helps lock pavers in place.
  • Complete paver installation
  • Install trim ring if desired for a finished look.